ob体育接口

ob体育接口 ob体育接口
Opinion
Live now
Start time
Playing for
End time
Listen live
Up next
ob体育接口

$1.4b construction kicks off for 'first' mid-lane busway

Author
NZ Herald,
Publish Date
Thu, 8 May 2025, 3:38pm
Construction of New Zealand’s first busway along the middle of a major urban road is moving ahead.
Construction of New Zealand鈥檚 first busway along the middle of a major urban road is moving ahead.

$1.4b construction kicks off for 'first' mid-lane busway

Author
NZ Herald,
Publish Date
Thu, 8 May 2025, 3:38pm
  • Construction of New Zealand鈥檚 first busway along the middle of an urban road is progressing, promising faster buses for East Auckland.
  • The busway, opening in 2027, will run along the middle of T墨 R膩kau Drive, improving connectivity between Pak奴ranga and Botany.
  • New traffic lanes and a shared path are already benefiting drivers, pedestrians, and cyclists between Gossamer Drive and Pak奴ranga Highway.

The $1.4 billion construction of New Zealand鈥檚 first busway along the middle of an urban road has kicked off in East Aucklan and is set to open in two years.

The Eastern Busway will bring rapid public transport to East Auckland and as part of this, four new bus stations and three new structures are being built.

Auckland Transport (AT) Eastern Busway programme director, Tom Willetts said: 鈥淭his is the first time we鈥檒l have a fully separated busway running along the middle of an urban road, with traffic lanes on either side.鈥

During the Easter weekend, the Eastern Busway project carried out a traffic switch on T墨 R膩kau Drive, AT said.

The traffic switch created space to build the busway from Pak奴ranga along the middle of T墨 R膩kau Drive to T墨 R膩kau Bridge, near Burswood.

An artist's impression of the Eastern Busway between Panmure and Pak奴ranga.
An artist's impression of the Eastern Busway between Panmure and Pak奴ranga.

鈥淒rivers and people walking, cycling and scootering are already benefiting from the Eastern Busway construction, with new traffic lanes and a shared path now open between Gossamer Drive and Pak奴ranga Highway,鈥 AT said.

Willetts said this extension of the Eastern Busway will open in 2027 and will enable bus services to run more often and reliably between Pak奴ranga and Botany.

Construction of New Zealand鈥檚 first busway along the middle of a major urban road is moving ahead.
Construction of New Zealand鈥檚 first busway along the middle of a major urban road is moving ahead.

He said a lot of work has gone into preparing for this stage of construction, so AT can build the busway along the middle of T墨 R膩kau Drive without affecting the flow of traffic.

鈥淭his is an exciting next step for the Eastern Busway project, which has already made millions of bus trips faster between Pak奴ranga and Panmure train station since that section of the busway opened in December 2021,鈥 Willetts said.

The $1.4b construction of New Zealand鈥檚 first busway along the middle of an urban road has kicked off in East Auckland. Photo / Auckland Transport
The $1.4b construction of New Zealand鈥檚 first busway along the middle of an urban road has kicked off in East Auckland. Photo / Auckland Transport

AT said the Eastern Busway is a key part of Auckland鈥檚 rapid transit system.

The City Rail Link will open in 2026, making it possible to get from Pak奴ranga to West Auckland without getting stuck in traffic.

鈥淔rom 2027, when the Eastern Busway opens, the East Auckland area between Panmure, Pak奴ranga and towards Botany will be even better connected,鈥 Willetts said.

鈥淭墨 R膩kau Drive is now back to having two vehicle lanes in each direction, and pedestrians and cyclists have safer, more convenient travel options.鈥

Take your Radio, Podcasts and Music with you